Quality procedures in DTI

The quality of the final product is the result of rigorous adherence to procedures at every stage of the project. The three key departments of our company are design, purchasing & cooperation, and assembly. Each of these departments has developed its own procedures supported by experience. This is how we create quality.

Quality assurance in Engineering Department

  • define the concept
  • create 3D model
  • Finite Element Method verification
  • necassary corrections
  • 2D detailed drawings
  • assembly drawings and material specification
  • final check and release to production

Quality assurance in Purchasing Department

  • supplier selection
  • supplier process control
  • participation in supplier acceptance procedures
  • certificates verification
  • re-check in DTI measuring dept

Quality assurance in Assembly Department

  • checking compliance and approval of received parts
  • mid – assembly testing
  • run-off in DTI
  • Pre – Acceptance Test
  • Final Acceptance Test

Let the references from our clients prove the effectiveness of these procedures.


Back to DTI TechAcademy